- Pre-Installation Preparations
- Remove the protective film from areas of the hood that will be inaccessible once it is suspended.
- Assess the load-bearing capacity of the structures where the hoods will be installed to ensure they can safely support the weight.
- Post-Installation Cleaning
- After completing all installation work, including control system (MaR) installations and any additional work by other contractors near the hoods, remove any remaining protective film.
- IMPORTANT NOTICE
- Grinding with an angle grinder is strictly prohibited in the vicinity of the hoods, even if they are covered by the protective film. This could damage the surface of the stainless-steel material.
Installation Manual
| EXHAUST HOODS – INSTALLATION, OPERATION, AND MAINTENANCE MANUAL |